UAIC Tribal School Project
Project Description
Placer County has released the Final Environmental Impact Report for the proposed UAIC Tribal School Project. The proposed United Auburn Indian Community (UAIC) Tribal School demolition of existing onsite structures and construction of a UAIC Pre-K through 8th grade school, a Tribal Education Center, and a Tribal Cultural Center on the northern third of the project site. The proposed structures would total approximately 48,650 square feet. Access to the proposed project site would be provided via Taylor Road to the north of the site. The project would include associated infrastructure improvements to support the proposed development.
Environmental Impact Report Documents
Certified 01/24/19
Draft Environmental Impact Report
Released 08/17/18
Individual Chapters
- Chapter 1 - Introduction (PDF)
- Chapter 2 - Executive Summary (PDF)
- Chapter 3 - Project Description (PDF)
- Chapter 4 - Air Quality (PDF)
- Chapter 5 - Biological Resources (PDF)
- Chapter 6 - Cultural Resources (PDF)
- Chapter 7 - Hazards and Hazardous Materials (PDF)
- Chapter 8 - Noise (PDF)
- Chapter 9 - Transportation and Circulation (PDF)
- Chapter 10 - Utilities and Service Systems (PDF)
- Chapter 11 - Cumulative Impacts and Other CEQA Sections (PDF)
- Chapter 12 - Alternatives Analysis (PDF)
- Chapter 13 - References (PDF)
- Chapter 14 - Environmental Impact Report Authors and Persons Consulted (PDF)
Appendices - Volume 1
Appendices - Volume 2
- Appendix D - Air Quality Modeling (PDF)
- Appendix E - Biological Resources Study Report (PDF)
- Appendix F - Arborist Report (PDF)
- Appendix G - Aquatic Resources Delineation Report (PDF)
- Appendix H - Phase I Environmental Site Assessment (PDF)
- Appendix I - Phase II Environmental Site Assessment (PDF)
- Appendix J - Final Preliminary Endangerment Assessment (PDF)
- Appendix K - Removal Action Work Plan (PDF)
- Appendix L - Noise Study Report (PDF)
- Appendix M - Traffic Impact Study (PDF)
- Appendix N - Sanitary Sewer Study (PDF)